How much contingency should I budget for a renovation?

The short answer

Set aside a contingency on top of the contractor's price, sized to the risk of the job. Cosmetic work with nothing hidden needs a small cushion; opening walls, floors or an older home's plumbing and wiring needs much more. Many renovators plan on roughly 10% to 20% of the construction cost, and keep it separate from upgrades they choose along the way.

Size it to the risk

What drives the contingency you need
Lower contingencyHigher contingency
Cosmetic: paint, fixtures, flooring over sound subfloorOpening walls, floors or ceilings
Newer home with known systemsOlder home: wiring, plumbing, framing unknown
Fixed-price contract with a detailed scopeVague scope or allowances for finishes
Materials already chosen and pricedLong lead times or volatile material prices

What the contingency is - and is not - for

  • For: rot, outdated wiring, code upgrades and other conditions found once work starts.
  • For: price changes on materials not yet bought.
  • Not for: upgrades you decide on mid-project. Budget those separately so the cushion is there when you need it.

How to protect your budget

  1. Get a detailed scope of work and written change-order process before signing.
  2. Ask the contractor what they expect to find behind walls in a home this age.
  3. Pay against completed work, not ahead of it.
  4. Track every change order against the contingency as you go.

Frequently asked questions

Is a 10% contingency enough?

It can be for straightforward work in a newer home. For older homes or projects that open walls, many plan for more.

Should the contractor's bid include a contingency?

Sometimes it does, as a line item or allowances. Ask how unknown conditions are priced so you know what your own cushion must cover.

What happens to unused contingency?

It stays yours. Leave it untouched until the project is complete rather than spending it on extras early.

Calculators and guides

Recommended next step

Price the work, then add a cushion sized to its risk.

Estimate the project and its contingency →

Sources and review

No regulator defines these terms; the page follows common industry practice and labels rules of thumb as such.

Where this applies: Not regulated. Investment ratios and budgeting allowances are industry conventions and rules of thumb, not requirements.

Last reviewed: · Updated:

Worked examples use illustrative round numbers, not current market data. Rates, limits and program rules change - confirm current figures with your lender or a qualified professional.

Share:

General educational information, not financial, legal, tax or real estate advice. Rules vary by loan program, transaction and location - verify important decisions with qualified professionals.